Delivery record

Published, defined, and gated on purpose.

Our on-time record is the most credentialing thing we have and the easiest thing in this industry to fake. So here is exactly what we measure, what we exclude, and what we will not claim yet.

On-time delivery
100%%

Twelve months running, measured to the PO-confirmed dispatch date

Weeks to dispatch
3–4–4

Against an industry standard of five to six

Units a month
25,000

Installed capacity on a semi-robotic, software-driven floor

Manufacturing since
2022

Pune — office in Camp, factory at Shindewadi

01

The definition

What “on time” means here.

A delivery promise is worthless without its measurement rule, and most published ones quietly omit it.
MEASURED AGAINST
The dispatch date confirmed on the purchase order — not an internal target, and not the date an enquiry arrived.
THE CLOCK STARTS
When the purchase order is confirmed and drawings are frozen. Design changes after that reset it, and we say so at the time.
EXCLUDED
Client-caused changes and site-not-ready delays. If your site is not ready that is not a miss on our part — but we will not count it as a hit either.
WHO CARRIES A MISS
We do, through the penalty clause in the purchase order. A promise with no consequence is marketing.
FEED GATED DASHBOARD v0

The live feed goes up when the operation has proven it at volume.

Every panel we make is barcoded and tracked from the beam saw through edge banding, drilling, QC and dispatch, so the underlying data is real and already exists. What we will not do is headline a hundred per cent record built at a fraction of our capacity, then scale into demand this site is designed to create and quietly stop updating it.

The dashboard is published when the record holds at the higher load — not before. Until then, ask us for the delivery history on any project named on this site.