Your design. Our manufacturing. Your name stays in front.
From shop drawings to manufacturing and installation, OutDo works behind your project to turn approved designs into finished furniture, while you stay in front of your client.
OutDo FurnishingsCommercial furniture manufacturerOur own manufacturing setup near PuneISO 9001:2015
OutDo furniture is installed at these companies
Delivered directly or through architects and turnkey partners who work with us.
A great design still depends on the people who build it
-
The specification changes quietly
“Plywood” on a BOQ is often supplied as commercial plywood, quoted exactly as written.
-
The site moves. The drawing doesn't.
A cabin drawn at 10 ft is 7 ft on site. Switch-plate cutouts turn up after delivery.
-
The date slips after the PO
Capacity is promised to win the order. Then a board colour runs out and adds about 12–15 days.
-
The vendor meets your client
A maker on your site starts selling to your client directly.
Your furniture manufacturer shouldn't become another project you have to manage.
We work behind your design
Three commitments that make us different for an architect.
Design integrity
Made to your drawing. A dedicated designer prepares the shop drawings and checks them against the real site, and nothing changes without your approval.
Manufacturing control
Wood, metal and aluminium in our own manufacturing setup, on two production lines and two shifts. Lead time is counted from frozen drawings, purchase order and advance.
Your client relationship
We sell only our own product and never bid for design or fit-out. Where an architect holds the client, we work through the architect.
From your drawing to your handover
Five steps from your drawing to your site.
- 1
Share drawings
Send your layout, furniture drawings or BOQ.Your layout, drawings or BOQ.
- 2
Shop drawings
A dedicated designer draws it for manufacturing, checks it against the real site and draws the electrical layout.Drawn for manufacturing, checked against the site.
- 3
Approval
Selections are frozen and checked against your date, with a mock-up for your approval where needed.Selections frozen; a mock-up where needed.
- 4
Manufacturing
Approved drawings drive the machines: cut lists, machine programs and a label for every panel.Approved drawings drive the machines.
- 5
Dispatch & installation
Site readiness is confirmed with your site in-charge, then our own team installs.Site readiness confirmed; our team installs.
Project lead time is counted from frozen drawings, purchase order and advance.
Share your drawingsProjects built from the architect's drawing
Education · Talegaon, Pune
NMIET
Next floors won
An HDHMR sample was kept in water for a day before the management and the architect approved it in place of the specified plywood.
Read the case study
Office · Head office, Pune
Tunwal E-Motors
Delay reduced
A listed electric-vehicle company's seven-floor headquarters, running late. Our furniture reduced the overall delay instead of adding to it. Architect: Anand Gujarati.
Read the case study
Banking · Head office
Godavari Bank
~₹1.5 Cr below the competing quote
Quoted against the BOQ prepared by the bank's architect, and delivered within the agreed time.
Read the case studyYour drawings come to our own factory near Pune
About 26,000 sq ft, with wood, metal and aluminium made in-house.
- Wood
- Metal
- Aluminium
- 2 production lines
- 2 shifts
The ten places a furniture vendor quietly puts your name at risk
From the BOQ to the handover, with the one question that closes each, to ask any vendor.
Before the order
01Will the maker go around me to my client?
What usually happens
You hand the furniture to a maker and put your name on it. The quieter risk is a maker who meets your client on site and starts selling to them directly.
How we close it
We used to do full interiors, so we understand the worry. In June 2024 we stopped and became a pure product company. We sell only our own product and never bid for design or fit-out. Where an architect holds the client, we work through the architect.
Ask any vendor: “Do you ever quote my client directly, for design or for a fit-out?”
02Every vendor says two lines, two projects and drawings on time
What usually happens
Capacity and drawings are promised to win the order. Some makers have no designers of their own, so drawings wait on someone else. The promise fails later, and you answer for it.
How we close it
Two production lines and two shifts, 7 AM to 2 AM. An in-house design team, with a dedicated designer and project manager on every order.
Ask any vendor: “Walk me through where my order will sit on your floor next week, and who, by name, draws it.”
03“Plywood” on a BOQ rarely means the plywood you had in mind
What usually happens
When a BOQ says “plywood”, what usually gets supplied is commercial plywood. Most vendors quote the words as written.
How we close it
Better material is proposed with a test you can run yourself, and nothing changes without your approval. At NMIET, an HDHMR sample was kept in water for a day before the management and the architect approved it. Read the NMIET case study
Ask any vendor: “What would you change in my specification, and how will I test it myself?”
During manufacturing
04The board colour that runs out
What usually happens
A distributor rarely holds more than about 100 sheets of one colour. A job above about ₹15–20 lakh often needs more, so the board is made to order at the mill, adding about 12–15 days, often after the colour has been shown to the client.
How we close it
On large jobs, we check the colour with the mill during selection and ask it to hold its production slot before the purchase order.
Ask any vendor: “Does any one colour need more than about 100 sheets, and whose stock are you counting on?”
05The PO is signed, and nothing moves
What usually happens
You issue the PO and assume the clock has started. The vendor's lead time turns out to count from something else, while your client heard a date counted from the PO.
How we close it
We say exactly what our lead time counts from: frozen drawings, purchase order and advance. Materials and selections are checked against your date before the order is placed, not after.
Ask any vendor: “From what exact event do you count your lead time, and which items in my order could miss the date?”
06The walls moved
What usually happens
The layout is drawn on day one. Then the site moves on: a partition shifts, changes are made on site. A cabin drawn at 10 ft may now be 7 ft.
How we close it
Our project manager and designer check the real site, and the drawings are corrected and approved before production.
Ask any vendor: “When will you check my site against your drawings?”
07The switch plates
What usually happens
Switch-plate cutouts are discovered during production, and the line stops while someone chases the size. Or, worse, on site after delivery.
How we close it
Our designers draw the furniture's electrical layout and share it with you and your electrician. The drawings don't move forward until the cutouts are in.
Ask any vendor: “Are the furniture and electrical layouts the same drawing, and when do you need my switch-plate details?”
08Chasing the vendor
What usually happens
Your team spends its week calling for dates, samples and status, and still hears about problems last.
How we close it
A dedicated project manager is your single point of contact, and you can see the project's current stage with one WhatsApp message.
Ask any vendor: “Who is my one point of contact, and can I see status without calling?”
At handover
09The delivery that goes wrong at the door
What usually happens
The truck arrives while the painters or the flooring are still working, there's nowhere to store the material, the lift isn't running, or too few fitters turn up.
How we close it
Before dispatch, our project manager confirms storage space, a working lift and the labour count with your site in-charge, and re-plans the dispatch if the site isn't ready. Helmets and safety shoes travel in our vehicles for MNC sites.
Ask any vendor: “Who confirms with my site in-charge that the site is ready, and how many fitters are coming?”
10Nobody answers after handover
What usually happens
After handover, a failed hinge becomes weeks of calls nobody answers.
The better way
Get after-sales in writing before the order: who replaces what, from whose stock, and how fast.
Ask any vendor: “If a hinge fails in eighteen months, who replaces it, and from whose stock?”
The office matches the drawing when the vendor plans before it makes.
Which part of your current project worries you most?
Pick one. We'll show you how we handle it.
Going around you to your client
How we handle it
- We sell only our own product and never bid for design or fit-out. Where an architect holds the client, we work through the architect.
Ask any vendor
“Do you ever quote my client directly, for design or for a fit-out?”
Capacity and drawings on time
How we handle it
- Two production lines and two shifts, 7 AM to 2 AM.
- An in-house design team, with a dedicated designer and project manager on every order.
Ask any vendor
“Walk me through where my order will sit on your floor next week, and who, by name, draws it.”
The specification
How we handle it
- Better material is proposed with a test you can run yourself, and nothing changes without your approval.
- NMIET: an HDHMR sample was kept in water for a day before the management and the architect approved it.
Ask any vendor
“What would you change in my specification, and how will I test it myself?”
The board colour running out
How we handle it
- On large jobs, we check the colour with the mill during selection and ask it to hold its production slot before the purchase order.
Ask any vendor
“Does any one colour need more than about 100 sheets, and whose stock are you counting on?”
The PO clock
How we handle it
- Project lead time is counted from frozen drawings, purchase order and advance.
- Materials and selections are checked against your date before the order is placed, not after.
Ask any vendor
“From what exact event do you count your lead time, and which items in my order could miss the date?”
Walls that moved
How we handle it
- Our project manager and designer check the real site, and the drawings are corrected and approved before production.
Ask any vendor
“When will you check my site against your drawings?”
Switch plates and cutouts
How we handle it
- Our designers draw the furniture's electrical layout and share it with you and your electrician.
- The drawings don't move forward until the cutouts are in.
Ask any vendor
“Are the furniture and electrical layouts the same drawing, and when do you need my switch-plate details?”
Chasing the vendor
How we handle it
- A dedicated project manager is your single point of contact.
- You can see the project's current stage with one WhatsApp message.
Ask any vendor
“Who is my one point of contact, and can I see status without calling?”
Delivery day on site
How we handle it
- Before dispatch, our project manager confirms storage space, a working lift and the labour count with your site in-charge.
- Helmets and safety shoes travel in our vehicles for MNC sites.
Ask any vendor
“Who confirms with my site in-charge that the site is ready, and how many fitters are coming?”
Not sure which one applies?
How we handle it
- Share the drawings of your live project. We'll review it from a manufacturing perspective and discuss what we see with you.
Ask any vendor
“Which of these can you answer for my project today?”
Before you appoint your next furniture manufacturer…
The Architect's Furniture Manufacturing Checklist
10 questions to ask before awarding a furniture manufacturing order.
Get the checklistHave a live project? Let's look at the drawings.
Share your BOQ, layout or furniture drawings. We'll review the project from a manufacturing perspective and discuss the next step with you.
Share your BOQ, layout or drawings. We'll review them from a manufacturing perspective and discuss the next step with you.
OutDo works as the manufacturing partner behind your project. We discuss the project with you, not with your client.